U.S. Consulate General in Guangzhou water purification works, the contractor for the project was very strict, treatment systems must meet secondary treatment requirements primarily United States, other appropriate treatment must be designed to meet the standards of AWWA American Water Works Association and Water Supply Manual , process water treatment system, including selected drawings, layout, control procedures and handling of calculation.
Division I as the United States Consulate General in Guangzhou selected drinking water purification process engineering contractor, responsible for the design of water treatment system drawings, has been officially recognized by the United States, now works into the specific implementation.
Project Description:
Owner: U.S. Department of State Bureau of Overseas Building
Total project cost: about $ 260,000,000
Premises area: 30,000 m2
Project Area: 20,500 square meters (22,000 square feet) of floor area
Assigned to the new premises of American institutions: 7
Project general contractor:B.L.Harbert International LLC
Architectural design:Skidmore,Owings & Merrill,LLP
The new U.S. consulate premises formed by a number of buildings, covering 7.4 acres (3 hectares together), will be completed for 300 staff with a safe, comfortable and efficient work environment.
New building will be seven buildings, each building has its specific functions. These include: the 4th floor of main building, near the Consulate General Services Building 4 layers, clan army barracks the Navy, with service between the Treasury, functional building, and 2 door post. New building is located in Tianhe District, Guangzhou, China, the Pearl River New City.